Project Details

Mactan Rock Pipe Laying Lapu-Lapu City

  • 75 ln.m. Pavement Cutting
  • 18 cu.m Pavement Breaking
  • 12.42sq.m. Subgrade Preparation
  • 115 cu.m Excavation
  • Hauling of Excavation Materials
  • 124 cu.m. Sand Bedding
  • 18 ln.m. Pipe Jointing 400 mm PE100-SDR13.6
  • 18 ln.m. Pipe Laying
  • 9.45 cu.m. Backfilling with Compaction
  • Warning Tape Laying