CONSTRUCTION OF CARRASCAL SYSTEMATIC DRAINAGE IMPROVEMENT PROJECT (PHASE II)

  • Demolition and Disposal of Demolished Road Pavement @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay
  • Excavation of Natural Ground @ Sta. 0+160.00 – Sta. 0+220.00, Brgy. Baybay
  • Laying of 8pcs Pre-Cast Drainage Canal @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay
  • Installation of Rebars and Formworks for Pre-Cast Dowel Joints @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay
  • Concrete Pouring of Pre-Cast Dowel Joints and Flooring @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay
  • Backfilling of Excavated Material @ Sta. 0+141.98 – 0+220.00, Brgy. Baybay
  • Installation of Formworks and Falsework for Drainage Canal Top Slab @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay
  • Installation of Rebars for Drainage Canal Top Slab @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay
  • Pouring of Concrete for the Restoration of Affected Road @ Sta. 0+130.42 – Sta. 0+154.04, Brgy. Baybay
  • Fabrication & Installation of Formworks for Drainage Canal Cover @ Site Office
  • Fabrication & Installation of Rebars for Drainage Canal Cover @ Site Office
  • Pouring of Concrete for Drainage Canal Cover @ Site Office
  • Pouring of Lean Concrete on Pre-Cast Drainage Sidings for Drainage Cover @ Sta. 0+167.91 – Sta. 0+220.00
  • Housekeeping
  • Installation of Safety Signages @ Brgy. Embarcadero – Brgy. Baybay

Project information

  • Client Municipality of Carrascal
  • Project date 22 January, 2024